| Improvement of Sengore - Dramaling Road (PNH) | GoI | MoIT | — | — | Completed | — | — |
| Improvement of Haa-Samtse SNH | GoI | MoIT | — | — | Ongoing | — | — |
| Improvement of Samtse-Norbugang SNH | GoI | MoIT | — | — | Ongoing | — | — |
| Improvement of Dzongkhag Roads | GoI | MoIT | — | — | Ongoing | — | — |
| Establishment of National Weather and Flood Warning Center (NWFWC) and scientific facilities, Thimphu | GoI | NCHM; MoENR | — | Cross Cutting | Ongoing | — | 2024–2029 |
| Construction of Waste Material recovery facility and incinerator | GoI | MoENR | — | Cross Cutting | Ongoing | — | 2024–2029 |
| Support to Solar and wind Projects | GoI | MoENR | — | Cross Cutting | Ongoing | — | 2024–2029 |
| Support to mini and micro hydropower project | GoI | MoENR | — | Cross Cutting | Ongoing | — | 2024–2027 |
| Project for Capacity Enhancement of Meteorological Observation, Forecasting and Flood Warning, for Disaster Preparedness and Response in Thimphu and Paro River Basins | JICA | NCHM | — | Disaster Risk Reduction | Completed | — | 31-12-24 |
| Verification Survey with the Private Sector for Disseminating Japanese Technologies for Small Scale Sewerage System with Energy Saving Technology | JICA | — | — | Water, Sanitation | Completed | — | 30-08-19 |
| Technology transfer project related to waste proper management in Thimphu City, Kingdom of Bhutan | JICA | — | — | Environment, Sanitation | Completed | — | 14-08-17 – 15-04-21 |
| SDGs Business Verification Survey with the Private Sector for Road-Slide Slope Disasters Countermeasure Technologies and Methods in the Kingdom of Bhutan | JICA | — | — | Disaster Risk Reduction | Completed | — | 15-06-23 |
| Data Collection survey for formulation recycling society upon Waste Management. | JICA | — | — | Environment, Sanitation | Completed | — | 14-07-21 – 31-03-22 |
| Data Collection Survey on Forest Information Management | JICA | — | — | Forestry | Completed | — | 31-03-26 |
| Waste Management Workshop towards Development of a Material Recycle Facility in Landfill Site at Paro | JICA | — | — | Environment, Sanitation | Completed | — | 31-03-26 |
| Activity for Disaster Management and Contingency Plan | JICA | — | — | Disaster Risk Reduction | Completed | — | 31-03-26 |
| Project for Capacity Development on Countermeasures of Slope Disaster on Roads in Bhutan | JICA | — | — | Disaster Risk Reduction | Completed | — | — |
| Procurement of Landslide Countermeasure Related Equipment (Japan's grant aid for the Economic and Social Development Fund) | JICA | — | — | Disaster Risk Reduction | Ongoing | — | 30-04-26 – 30-04-28 |
| Project for Capacity Development in Landslide Risk Reduction | JICA | — | — | Transport | Ongoing | — | 30-04-29 |
| The Project for Strengthening Forest Management Capabilities Using Data and Digital Technology | JICA | — | — | Forestry | Pipeline | — | 30-03-31 |
| Waste Management Capacity Development Advisor | JICA | — | — | Environment, Sanitation | Ongoing | — | 17-02-25 – 16-02-27 |
| Hydropower Technical Advisor | JICA | — | — | Renewable Energy | Ongoing | — | — |
| Enhancing sustainability and climate resilience of forest and agriculture landscape and community livelihood (NAPA III) | GEF | GNHCS; MoF; MoAL; MoIT; MoENR | Bumthang, Haa, Mongar, Paro, Sarpang, Thimphu, Trongsa, Zhemgang, Wangdue Phodrang | Agriculture, Livestock, Forestry | Completed | USD 13.9m | Sept 2023 |
| Supporting Climate Resilience and Tranformational Change in the Agriculture Sector in Bhutan | GCF | GNHCS; MoF; MoAL; MoIT; MoENR | Dagana, Punakha, Samtse, Sarpang, Trongsa, Tsirang, Zhemgang, Wangdue Phodrang | Agriculture, Forestry, Cross Cutting | Completed | USD 25.3m | — |
| Bhutan for Life | GCF | BFL Secretariat; MoENR | — | Forestry, Cross Cutting | Ongoing | USD 26.6m | 2018–2032 |
| Climate Adaptation, Resilience and Engagement in Local Government (CARE-LG) | GCF | DPBP; MoF; MoENR; MoHA | — | Cross Cutting | Ongoing | USD 10.0m | 2025–2029 |
| Advancing Climate Resilience in Water Sector in Bhutan (ACREWAS) | GEF | DoID; MoIT; MoENR; MoAL | Gasa, Punakha, Tsirang | Water, Cross Cutting | Ongoing | USD 8.9m | 2023–2028 |
| Mainstreaming Biodiversity into the Tourism Sector in Bhutan (ecotourism) | GEF | DOTourism MOICE; MoENR; MoAL | Lhuentse, Mongar, Zhemgang, Tashigang, Tashi Yangtse | Tourism, Biodiversity, Cross Cutting | Completed | USD 4.8m | Sept 2021 |
| Productive and Sustainable Food Systems in Bhutan for Environmental Benefits and Gross National Happiness (FSP) | GEF | MoAL; MoENR | Lhuentse, Mongar, Pemagatshel, Samdrup Jongkhar, Tashigang, Tashi Yangtse | Food, Agriculture, Forestry, Cross Cutting | Ongoing | USD 10.3m | 2025–2030 |
| Enhancing the Climate Resilience of Urban Landscapes and Communities in Thimphu-Paro region of Bhutan (ECRUL) | GEF | DHS; MoIT; MoENR; MoICE; MoF | Paro, Thimphu | Water, Human Settlement, Forest Fire, Corss-cutting | Ongoing | USD 20.0m | 2025–2031 |
| Adaptation to Climate-induced Water Stresses through Integrated Landscape Management in Bhutan | AF | DoW; MoENR; MoIT; MoAL | Dagana, Paro, Tsirang | Water | Ongoing | USD 9.9m | 2023–2028 |
| Innovative adaptation financing to build the resilience and adaptive capacity of smallholder farmers in Bhutan (InAF-Bhutan) | AF | DoA; MoAL; Insurance companies | Dagana, Lhuentse, Tsirang, Tashigang | Agriculture, Cross Cutting | Ongoing | USD 5.0m | 2025–2030 |
| Securing Water and Enhancing Climate Resilience in Thimphu District, Bhutan | AF | Thimphu Dzongkhag; BES; DoW; MoENR; MoAL; MoIT | Thimphu | Water, Agriculture, Cross Cutting | Pipeline | USD 5.0m | 2027–2030 |
| Building Resilient commercial Smallholder Agriculture (BRECSA) project | IFAD, GAFSP | DoA; MoAL | Sarpang, Trongsa, Tsirang, Zhemgang | Agriculture, Livestock, Forestry | Ongoing | USD 19.3m | 2023–2030 |
| Food Security and Agriculture Productivity (FSAPP) | GAFSP | DoA; MoAL | Dagana, Haa, Samtse, Sarpang, Chhukha | Agriculture, Livestock, Forestry | Completed | USD 12.6m | 2017–2025 |
| Commercial Agriculture and Resilient Livelihoods Enhancement Programme (CARLEP) | IFAD | DoA; MoAL | Lhuentse, Mongar, Pemagatshel, Samdrup Jongkhar, Tashigang, Tashi Yangtse | Agriculture, Livestock, Forestry | Completed | USD 31.5m | 2015–2025 |
| Accelerating Decarbonization: Closing the Energy Gap through Market-Driven Solar Power Solutions (Euro 18.720) | MAF | DOE; MoENR; MoH; BPC; ERA; Banks; BTFEC; RMA; MoF | — | Energy | Pipeline | USD 20.1m | — |
| Accessing Bhutan’s Biological Resources through Sustainable Conservation, Community Empowerment and capacity building under Nagoya Protocol (NBSAP) | GEF | NBC | — | Biodiversity | Ongoing | USD 450k | 2025–2028 |
| Small Grant Program (SGP) during GEF Operational Phase 5, 6, 7 | GEF | UNDP; CSOs and CBOs | — | Cross Cutting | Ongoing | USD 1.9m | 2010–2026 |
| Enabling the Kingdom of Bhutan to prepare 4th National Communication and 1st and 2nd BTR | GEF | DECC; MoENR | — | Cross Cutting | Ongoing | USD 1.2m | 2023–2027 |
| Strengthening institutional and technical capacities for enhanced transparency in implementation and monitoring of Bhutan?s Nationally Determined Contribution (NDC) (CBIT) (MSP) | GEF | DECC; MoENR | — | Cross Cutting | Ongoing | USD 1.8m | 2021–2026 |
| National Reporting under the UNCCD with Support for Enhanced Data/Reporting | GEF | NSSC; MoAL | — | Land, Cross Cutting | Ongoing | USD 120k | 2025–2026 |
| Support to Preparation of the Fifth National Reports on the Implementation of the Cartagena Protocol on Biosafety | GEF | BFDA; MoH | — | Cross Cutting | Ongoing | USD 33k | 2025–2026 |
| Support for Preparation of the First National Report on the Implementation of the Nagoya Protocol | GEF | NBC; MoAL | — | Cross Cutting | Ongoing | USD 33k | 2025–2026 |
| Enhancing institutional capacity for effective mainstreaming and implementation of NBSAP | KBF | NBC; MoAL | — | Biodiversity, Cross Cutting | Completed | USD 200k | — |
| Enhancing risk-informed planning, data-driven decision making and early warning system for disaster-resilient urban infrastructure in major cities of Bhutan- Coalition for Disaster Resilient Infrastructure (CDRI) | CDRI | MoIT | Thimphu | Urban Resilience, Cross Cutting | Ongoing | USD 745k | 2025–2027 |
| Building Adaptive Capacity through Innovative Management of Pests/Disease and Invasive Alien Species (IAS) in Bhutan to Enhance Sustainable Agro-Biodiversity and Livelihoods | AF | DECC; MoENR | Mongar | Invasive Species Control | Ongoing | USD 250k | 2022–2027 |
| Bhutan Livable and Resilient Cities Project (LRCP) | GCF, World Bank | DHS; MoIT | Thimphu | Transport, Water, Infrastructure, Cross Cutting | Pipeline | USD 48.0m | — |
| GEF-8 OFP Oversight Support Project- 31,445 | GEF | — | — | Cross Cutting | Ongoing | USD 31k | — |
| “Strategic framework to strengthen the Capacity of NDA to access resources from the Green Climate Fund and support for direct access accreditation process” (BTN-RS-001) | GCF | GNHC | — | Cross Cutting | Completed | USD 400k | — |
| “Strengthening NDA and related institutions, including financial institutions, in Bhutan for effective engagement with GCF” (BTN-RS-003) | GCF | GNHC | — | Cross Cutting | Completed | USD 299k | — |
| "Preparation of the National Adaptation Plan (NAP) for Bhutan with a focus on implementation of comprehensive risk management in the water sector” (BTN-RS-002) | GCF | NEC | — | Cross Cutting | Completed | USD 3.0m | — |
| Strengthening REDD+ and watershed management in Bhutan (BTN-RS-004) | GCF | MoAF | — | Cross Cutting | Completed | USD 595k | — |
| Building the Capacity of Bhutan’s National Stakeholders to Address Climate and Disaster Related Risks (BTN-RS-005) | GCF | DMDF; NCHM | — | Cross Cutting | Completed | USD 975k | — |
| Strengthening capacities and enhancing climate data and services in Bhutan to scale-up climate financing from multiple sources (BTN-RS-006) | GCF | RSPN | — | Cross Cutting | Completed | USD 991k | — |
| Preparation of Bhutans NDC 3.0 and enhancedstrategies, systems and in-country capacities toachieve its climate objectives and targets (BTN-RS-007) | GCF | DECC | — | Cross Cutting | Ongoing | USD 900k | 2025–2027 |
| Enhancing Climate Information and Multi-Hazard Early Warning for Resilience in Bhutan | GCF | NCHM; MoENR; MoIT; private sectors | — | Early Warning System, Cross Cutting | Pipeline | USD 22.0m | — |
| Strengthening Adaptation and Flood and Landslide Early Warning for the HKH (SAFE NIB) – a regional project proposal (Bhutan, Nepal and India). | AF | MoIT; NCHM; DLGDM | — | Early Warning System, Cross Cutting | Pipeline | USD 30.0m | — |
| Integrated Drought Management for South Asia (29.766) | AF | NCHM; DoW; DoA; NSSC | — | Drought Management | Pipeline | USD 29.8m | — |
| Least Developed Countries (LDC) Initiative for Effective Adaptation and Resilience (LIFE-AR) | AF | DECC; MoENR | — | Cross Cutting | Pipeline | USD 5.0m | — |
| Climate-Resilient Wildfire Prevention and Adaptive Landscape Management in Bhutan | AF | DoFPS; MoENR | — | Forest Fire | Pipeline | USD 5.0m | — |
| CIF Accelerating Resilience Investments and Innovations for Sustainable Economies Investment Program (ARISE Program) | CIF | DoW; MoENR; MoIT | — | Water, Cross Cutting | Pipeline | USD 30.0m | — |
| SCALE: Scaling Climate Adaptation through Local Enterprises: Adaptation Finance Pathway for Vulnerable Mountain Communities in Bhutan and Nepal | AF | MoF; RMA; FIs | — | Cross Cutting | Pipeline | USD 5.0m | — |
| Improving Food Security in the Himalayas through Integrated Nature-based Solutions for Water, Productive Renewable Energy, and Climate-Resilient Agriculture (HI-ADAPT) | AF | MoENR; MoAL | — | Cross Cutting, Food, NbS, Agricutlure | Pipeline | USD 29.9m | — |
| HI-RANGE: Enhancing the climate resilience of rangeland ecosystems and pastoral livelihoods in the Hindu Kush Himalaya region. | AF | MoENR; MoAL | — | Cross Cutting, Food, NbS, Agricutlure | Pipeline | USD 30.0m | — |
| Strengthening Climate Resilience across Bhutan’s Mountain and Downstream Landscapes | GCF | Tarayana Foundation; MoAL; MoENR; MoIT | — | Agriculture, NbS, Food, Cross Cutting | Pipeline | USD 30.0m | — |
| Sustainable Management and Advancing Agricultural Resilient Transformation (SMAART) | GAFSP | MoAL | Chhukha, Dagana, Haa, Punakha, Samtse, Wangdue Phodrang | Agriculture, NbS, Food, Cross Cutting | Pipeline | USD 17.2m | — |
| Green and Resilient Affordable Housing Project | ADB | NHDCL | Pemagatshel, Samdrup Jongkhar, Samtse, Thimphu, Tashi Yangtse | Energy-efficiency | Ongoing | USD 30.0m | — |
| Solar Farm Expansion project | ADB | DGPC & BPC | Bumthang, Lhuentse | Energy-efficiency | Ongoing | USD 160.5m | — |
| Inclusive and Resilient Urban Development Project | ADB | PT & NHCDL | Thimphu | Water, Sanitation | Ongoing | USD 13.0m | — |
| Renewable Energy for Climate Resilience Project | ADB | Dept | — | Energy | Ongoing | USD 18.3m | — |
| Distributed Solar for Public Infrastructure Project | ADB | DGPC | Trongsa | Energy | Ongoing | — | — |
| Climate-Resilient Omchhu River Basin Project | ADB | Phuentsholing Thromde | — | Climate Resilience | Ongoing | — | — |
| Building Adaptation & Resilience in HKH | ADB | ADB; P | — | — | Ongoing | — | — |
| Water Flagship Program Support Project | ADB | DoID; MoIT | Chhukha, Mongar, Thimphu, Wangdue Phodrang, Zhemgang | Water & Sanitation | Ongoing | — | — |
| Establishment of Permanent Biodiversity Monitoring Plot for Education and Conservation Studies | BTFEC | Sherubtse College; Royal University of Bhutan | Tashigang | Biodiversity Conservation | Ongoing | — | — |
| Integrating Conservation and Community Livelihoods Through Holistic Management of Biological Corridor 9 | BTFEC | Trashigang Divisional Forest; DoFPS; MoENR | Tashigang, Tashi Yangtse | Forestry | Ongoing | — | — |
| Zero Waste Initiative: Adopting Circular Solutions for Sustainable Water Management in Denchhi Throm | BTFEC | Pemagatshel Dzongkhag Administration | Pemagatshel | Waste | Ongoing | — | — |
| Enhancing agriculture in Tsephu village through innovative and climate resilient solar irrigation infrastructure | BTFEC | Punakha Dzongkhag | Punakha | Cross-cutting: Agriculture, Water | Ongoing | — | — |
| Installation of Solar Water Heater System | BTFEC | MoESD | — | Energy | Ongoing | — | — |
| Gyalsung Environment Management | BTFEC | Gyalsung Headquarters | — | Waste | Ongoing | — | — |
| Domestication of high-value wild edible mushrooms through the support of a research facility | BTFEC | National Mushroom Centre; Department of Agriculture; Ministry of Agriculture and Livestock (MoAL) | Thimphu | Agriculture | Ongoing | — | — |
| Solar Wellness for Monks | BTFEC | Serlung Goenzin Dhuedhey Lungtog Choeling; Zhung Dratshang | Paro | Energy | Completed | — | — |
| Beyond Honey: Climate-smart Apiculture for Ecosystem Services, Sustainable Food Production and Biodiversity Conservation | BTFEC | National Livestock Research Center; Bumthang; Department of Livestock; MoAL | — | Agriculture | Ongoing | — | — |
| Improving conservation decision-making in Bhutan with environmental DNA: A Strategic Initiative towards Achieving 30X30 Conservation Goals | BTFEC | DoFPS; MoENR | Punakha | Forestry | Ongoing | — | — |
| Participatory on-farm conservation and sustainable use of native horticulture crop diversity | BTFEC | NBC | Trongsa, Zhemgang, Tashigang, Chhukha | Agriculture | Ongoing | — | — |
| Feasibility Assessment for Ecotourism Development Strategy of Phibsoo Wildlife Sanctuary and Royal Manas National Park. | BTFEC | GMC | — | Ecotourism | Ongoing | — | — |
| Drinking Water Supply Improvement for Jurmey Gewog. | BTFEC | Mongar Dzongkhag | Mongar | Water & Sanitation | Ongoing | — | — |
| Turning Waste into Resources: Establishment of a Community Waste Drop-off and Recycling Centre in Pemathang Gewog | BTFEC | Samdrupjongkhar Dzongkhag | — | Waste | Ongoing | — | — |
| Rainwater Harvesting System for Five Student Hostels at the College of Science and Technology (CST) Campus. | BTFEC | College of Science and Technology; Royal University of Bhutan | — | Water & Sanitation | Ongoing | — | — |
| Livelihood Enhancement of Chudthak Community through Climate-Resilient and Nature-Based Approaches. | BTFEC | Trashigang Dzongkhag | Tashigang | — | Ongoing | — | — |
| Climate-resilient water management for sustainable agriculture in Changsima village, Hungrel Gewog, Paro | BTFEC | Paro Dzongkhag | Paro | Cross Cutting, Water, Agriculture | Completed | — | — |
| Optimizing agriculture land and climate resilient through solar lift irrigation for Bali Chiwog, Chubu Gewog-Punakha Dzongkhag | BTFEC | Punakha Dzongkhag | Punakha | Cross Cutting, Water, Agriculture | Completed | — | — |
| Preventing extirpation of musk deer in Bhutan | WWF | DoFPS; MoENR | — | Conservation | Ongoing | USD 335k | — |
| Zero Poaching in Bumthang Forest Division | WWF | Bumthang Forest Division; DoFPS; MoENR | Bumthang, Trongsa | Conservation | Unknown | USD 80k | — |
| Edge Species Protection Through Habitat Improvement & Fostering Positive Relations with the Community | WWF | DoFPS; MoENR | Haa, Paro | Conservation | Ongoing | USD 95k | — |
| Managing Human-Tiger Coexistence for the Long Term in Bhutan | WWF | Bhutan Tiger Center and Zhemgang Forest Division | Trongsa, Zhemgang | Forestry | Completed | USD 180k | — |
| Climate Crowd Phase I- Improvement and Rehabilitation of Water Intake and Distribution System in Langchenphu and Samrang Community. | WWF | DoFPS; MoENR | — | Cross Cutting, Water, Forestry | Completed | USD 70k | — |
| Climate Crowd Phase II- Strengthening resilience of communities and wildlife in Jomotsangkha Wildlife Sanctuary, Bhutan | WWF | DoFPS; MoENR | — | Cross Cutting, Agriculture, Livelihood | Ongoing | USD 95k | — |
| Tiger Impact Certificate | Global Tiger Innovation Fund (WWF-Australia) | WWF-Bhutan | Trongsa | Conservation | Ongoing | USD 70k | — |
| Wildinsync eDNA in Bhutan | WWF-Bhutan, ETH Zurich | DoFPS; MoENR; CNR; RUB | — | Biodiveristy | Pipeline | USD 223k | — |
| Living Landscapes: Securing High Conservation Values in Southwestern Bhutan | IKI | WWF-Bhutan and DoFPS; MoENR; Tarayana Foundation; National Land Commission Secretariat; Ministry of Agriculture and Livestock and Ministry of Finance | Dagana, Haa, Paro, Samtse, Sarpang, Thimphu, Tsirang, Zhemgang, Chhukha | Biodiveristy | Ongoing | USD 7.2m | — |
| Advancing Climate-Smart Agriculture Development and Rural Livelihood Opportunities in Zhemgang District | Bhutan Foundation | Zhemgang District administration & Khengrig Namsum Cooperative | Zhemgang | Cross Cutting, Agriculture, Livelihood | Ongoing | — | — |
| Promoting Ecological and Commnity Engagement (PEaCE) for Snow Leopard Conservation in Bhutan | Bhutan Foundation | Department of Forest and Park Services; Nature Conservation Division & Thimphu Dzongkhag | Haa, Thimphu | Conservation | Ongoing | — | — |
| Status of Pangolins in Royal Manas National Park and their Conservation through Multi-stakeholder Engagement | Bhutan Foundation | DoFPS; MoENR | — | Conservation | Completed | — | — |
| Empowering Dagala Pastoralists through Improved Yak Dairy Processing and Value Addition | Bhutan Foundation | Thimphu Dzongkhag | — | Cross Cutting, Livestock, Livelihood | Pipeline | — | — |
| Enhancing Agriculture productivity of Smallholder Farmers through Innovation and Farm Mechanization. | Bhutan Foundation | Samdrupjongkhar Initiative | — | Agriculture | Completed | — | — |
| Empowering rural communities through Agri-product innovation and local Enterprise Development | Bhutan Foundation | Tarayana Foundation | Mongar, Tashigang | Agriculture | Completed | — | — |
| Planet Satellite Data and Imagery to Support Bhutan’s Climate and Environmental Goals - Project Centinela | Bhutan Foundation | NLCS; GMCA; DHS; DoW; DoFPS; CNR; WWF-Bhutan; NSB; NCHM | — | — | Ongoing | — | — |
| Enhancing livestock productivity through Restoration of Degraded Pastureland in Gogona community. | Bhutan Foundation | Gogona Diary Cooperatives with Technical support from District livestock Sector | — | Cross Cutting, Livestock, Agriculture | Ongoing | — | — |
| Revitalization and Income Support Effort (RISE) for Samcholing Tea Community | Bhutan Foundation | Trongsa Dzongkhag and Samcholing Tea Coopoeratives | Trongsa | Cross Cutting, Agriculture, Livelihood | Ongoing | — | — |
| Sustaining an Abundance of Forest Ecosystems (SAFE) Initiative | AFoCO / UNEP | DoFPS | — | Forestry | Ongoing | USD 59k | — |
| Sustainable Community-Based Enterprises for Improved Livelihood in Bhutan | AFoCO | DoFPS | — | Forestry | Ongoing | USD 1.0m | 30-06-20 – 31-12-25 |
| Restoring Fire-Damaged Ecosystems and Enhancing Wildland-Urban Interface Resilience in Bhutan | AFoCO | Department of Forests and Park Services (DoFPS | — | Forestry | Ongoing | USD 1.2m | 30-06-30 |
| Sustainable Community-Based Enterprises for Improved Livelihood in Bhutan | AFoCO | DoFPS | — | Forestry | Completed | USD 1.0m | 30-06-20 – 31-12-25 |
| Improved Local Community Livelihoods Through Increased Income from Non-Timber Forest Products (NTFPs) | AFoCO | DoFPS | — | Forestry | Ongoing | USD 200k | — |
| Production of Commercial Biogas from Household Waste (BES) | SAARC Development Fund (SDF) | Bhutan Ecological Society (BES) | — | Energy / Waste | Ongoing | USD 449k | — |
| Demonstration of Municipal Solid Waste Composting in Memelekah | Institute for Global Environmental Strategies (IGES) | Thimphu Thromde | Thimphu | Waste | Completed | USD 47k | 13-02-25 – 29-08-25 |
| Pilot Project on the Creation of an Organic Recycling Loop in Paro, Bhutan | Institute for Global Environmental Strategies (IGES) | Paro Dzongkhag Administration | Paro | Waste | Ongoing | USD 20k | 30-11-27 |
| National Soil Information Systems to Support the Transformation of Agrifood Systems (Soil Phase 2) | Asian Food and Agriculture Cooperation Initiative (AFACI) | National Soil Services Centre (NSSC) | — | Agriculture | Ongoing | USD 90k | — |
| Inclusive markets, Production, Agricultutural Commercialization and Transformation project (IMPACT) | IFAD Loan | PMU; NLRC; BFDA KIL; BAIL | Bumthang, Lhuentse, Mongar, Pemagatshel, Samdrup Jongkhar, Tashigang, Tashi Yangtse | Agriculture | Ongoing | USD 10.0m | 30/06/2032 |
| Commercial Agriculture And Resilient Livelihoods Enhancement Program (CARLEP) | International Fund for Agriculture Development (IFAD) | Office of the Program Management; Ministry of Agriculture and Livestock; Co-located at ARDC-Wengkhar; Koufuko International Ltd; BAIL | Lhuentse, Mongar, Pemagatshel, Samdrup Jongkhar, Tashigang, Tashi Yangtse | Agriculture | Completed | USD 25.5m | 11/12/1015 – 31/12/2025 |
| Construction of FCR tank and water source protection through chain link fencing at Rijuk Dawathang | EU | MoHA; Chhoekhor | — | Cross Cutting | Ongoing | — | — |
| Construction of 165m Irrigation Channel at Nimlung under Kidzom Chiwog | EU | Tang | — | Cross Cutting | Ongoing | — | — |
| Maintenance and Protection of Gaytsa Buli Water Source | EU | Chhumig | — | Cross Cutting | Ongoing | — | — |
| Construction of Water Reserviour Tank at Ura Dozhi | EU | Ura | — | Cross Cutting | Ongoing | — | — |
| Construvtion of FCR tank at Chapcha Primary School water source, replacement of damaged HDPE pipelines, and procurement of a 2000-liter Syntax tank at Gewog Office. | EU | Chapchha | — | Cross Cutting | Ongoing | — | — |
| Improvement of intake structures, replacement of deteriorated HDPE pipelines and construction of FCR tank at Pamji water source | EU | Loggchina | — | Cross Cutting | Ongoing | — | — |
| Construction of retaining wall along Pangu farm road | EU | Maedtabkha | — | Cross Cutting | Ongoing | — | — |
| Maintenance of irrigation channel at Mondokha | EU | Doongna | — | Cross Cutting | Ongoing | — | — |
| RWSS at lower Pakchina, under Samphelling Gewog | EU | Samphelling | — | Cross Cutting | Ongoing | — | — |
| Maintenance of Irrigtion Channel at Damji village | EU | Bongo | — | Cross Cutting | Ongoing | — | — |
| Construction of Irrigation Drain at Mebisa | EU | Bjabcho | — | Cross Cutting | Ongoing | — | — |
| RWSS in Chongaykha | EU | Geling | — | Cross Cutting | Ongoing | — | — |
| Construction of Catch Pits along Ambithang Chiwog Farm Road | EU | Drukjeygang | — | Cross Cutting | Ongoing | — | — |
| Tashiding-Integrated Wetland Irrigation enhancement through installation of HDPE Pipeline within the command area of Chain Link Fencing | EU | Tashiding | — | Cross Cutting | Ongoing | — | — |
| Improvement of Dreychu Irrigation Channel in Namzhigang, Bartsa | EU | Karna | — | Cross Cutting | Ongoing | — | — |
| Construction of Causeway and Drain at Samarchu (Dharay) | EU | Tsenda-Gang | — | Cross Cutting | Ongoing | — | — |
| Maintenance of Sarkhari Irrigation Channel | EU | Gozhi | — | Cross Cutting | Ongoing | — | — |
| Construction of protection wall for Sampang irrigational channel | EU | Lhamoi Dzingkha | — | Cross Cutting | Ongoing | — | — |
| Improvement of Farm Road at Jemathang Farm Road | EU | Karmaling | — | Cross Cutting | Ongoing | — | — |
| Construction of causeway with wall at Balukhop, Tsalabji chiwog | EU | Dorona | — | Cross Cutting | Ongoing | — | — |
| Maintenance of Tanju Irrigation channel at Tanju | EU | Gesarling | — | Cross Cutting | Ongoing | — | — |
| Maintenance of RWSS (HDPE Pipe) at Wopathangka, Kuchuna and Bazingkha | EU | Tseza | — | Cross Cutting | Ongoing | — | — |
| Construction of Nangba to Dorothang Irrigation Channel | EU | Largyab | — | Cross Cutting | Ongoing | — | — |
| Maintainance of Zinchella Water Supply Scheme | EU | Tsangkha | — | Cross Cutting | Ongoing | — | — |
| Renovation of Gangatey Irrigation Channel (1.5KM) | EU | Nichula | — | Cross Cutting | Ongoing | — | — |
| Construction of retaining wall and drainage system at Chongra Lubcha | EU | Laya | — | Cross Cutting | Ongoing | — | — |
| Construction of Drainage System and Installation of Hume Pipes at Tsheringkha Chiwog | EU | Khatoed | — | Cross Cutting | Ongoing | — | — |
| Construction of Irrigation Channel at Zomina | EU | Khamaed | — | Cross Cutting | Ongoing | — | — |
| Construction of Riverbank Protection Wall at Lunana Gewog. | EU | Lunana | — | Cross Cutting | Ongoing | — | — |
| Construction of wooden bridge at Janaphakha over the Yakchu River. | EU | Bji | — | Cross Cutting | Ongoing | — | — |
| Construction of Retaining wall at Nakha | EU | Sangbay | — | Cross Cutting | Ongoing | — | — |
| Improvement of Irrigation Infrastructure through Construction of 110- Meter Channel from Bozolom to Taktsena, Dorithasa Chiwog. | EU | Gakiling | — | Cross Cutting | Ongoing | — | — |
| Construction of Water Reservoir Tank for Fire Risk Reduction at Dranadingkha Lhakhang. | EU | Kar-tshog | — | Cross Cutting | Ongoing | — | — |
| Construction of RWSS at Lamjogang | EU | Samar | — | Cross Cutting | Ongoing | — | — |
| Spring Shed Management for revival of water source at Yokpaling | EU | Maedtsho | — | Cross Cutting | Ongoing | — | — |
| Restoration of RWSS at Murmur Village. | EU | Maenbi | — | Cross Cutting | Ongoing | — | — |
| Revival and Development of lake- Tshoi Lungpa | EU | Jarey | — | Cross Cutting | Ongoing | — | — |
| Land Development at Jasabi | EU | Kurtoed | — | Cross Cutting | Ongoing | — | — |
| Sustainable Land Management at Gonyid–Wambur | EU | Tsaenkhar | — | Cross Cutting | Ongoing | — | — |
| Improvement of farm road at Zhamling | EU | Gangzur | — | Cross Cutting | Ongoing | — | — |
| Construction of 3KM L drain along Thumbari farm road | EU | Ngatshang | — | Cross Cutting | Ongoing | — | — |
| Intake and channel improvement, drainage works, water source strengthening, and integrated pest management at Selkhar | EU | Balam | — | Cross Cutting | Ongoing | — | — |
| RWSS at Thuenmong-Tokari | EU | Tsamang | — | Cross Cutting | Ongoing | — | — |
| RWSS at Tsalabi-Oloki Chiwog, Neykolog-Nanaric Chiwog and, Phogsothong-Shingchongri Chiwog. | EU | Kengkhar | — | Cross Cutting | Ongoing | — | — |
| Tsaburi Grid-Powered Lift Irrigation Scheme | EU | Shermuhoong | — | Cross Cutting | Ongoing | — | — |
| Construction of RCC Reservoir Tank and Distribution Line at Boucholing | EU | Thang-Rong | — | Cross Cutting | Ongoing | — | — |
| Construction of Reservoir Water Tanks at Pam – Dungsingma, Yetong - Jarshingpoktor Chiwog, Kharnang Chiwog and Yangrapungshing Chiwog. | EU | Chagsakhar | — | Cross Cutting | Ongoing | — | — |
| Maintenance and Renovation of Kurizampa RWSS under Chhaling Gewog | EU | Chhaling | — | Cross Cutting | Ongoing | — | — |
| Rural Water Supply Scheme for Gomchu Chiwog | EU | Narang | — | Cross Cutting | Ongoing | — | — |
| Construction of a water storage reservoir in Kidheykhar Chiwog | EU | Monggar | — | Cross Cutting | Ongoing | — | — |
| Improvement of drainage infrastructure, installation of hank pipes for sewage management, and reclamation of fallow land in Drametse Gewog | EU | Dramedtse | — | Cross Cutting | Ongoing | — | — |
| Sustainable Dry Land Irrigation at Kaling Thumling | EU | Tsakaling | — | Cross Cutting | Ongoing | — | — |
| Bench Terracing at Tshegpa | EU | Jurmed | — | Cross Cutting | Ongoing | — | — |
| Development of Menchu shed at Khamjila | EU | Drepoong | — | Cross Cutting | Ongoing | — | — |
| Construction of Storm Drainage system at Rashigang Primary School. | EU | Nagya | — | Cross Cutting | Ongoing | — | — |
| Improvement of RWSS at Ramcheytsekha and Extension to Chunjey through Construction of Reservoir Tank and Pipeline Installation. | EU | Tsento | — | Cross Cutting | Ongoing | — | — |
| Maintenance of Farm Road along with Irrigation Channel at Atsho and Chubar Dong Ra under Atsho -Phunub and Chubar Villages | EU | Doteng | — | Cross Cutting | Ongoing | — | — |
| Improvement of farm road at Jookha Jangsa | EU | Dopshar-ri | — | Cross Cutting | Ongoing | — | — |
| Renovation of Irrigation channel at Dochorten-Neyphu | EU | Shaba | — | Cross Cutting | Ongoing | — | — |
| (River Bank Protection Wall (Boulder Barrier Wall) at Rema Tsekha) | EU | Lamgong | — | Cross Cutting | Ongoing | — | — |
| Construction of kitchen and toilet at Dawakha Nekhang | EU | Dokar | — | Cross Cutting | Ongoing | — | — |
| Construction of irrigation channel from Paljorling to Changsima | EU | Hoongrel | — | Cross Cutting | Ongoing | — | — |
| Construction of reservior tank at Chumeydingkha | EU | Loong-nyi | — | Cross Cutting | Ongoing | — | — |
| Construction of Irrigation Channel at Geptay under Wangchang Gewog | EU | Wangchang | — | Cross Cutting | Ongoing | — | — |
| Rural Water Supply Scheme for Phadhi Village | EU | Khar | — | Cross Cutting | Ongoing | — | — |
| Construction of retaining wall at Lungtshering Drangnang under Menchu Chiwog | EU | Norboogang | — | Cross Cutting | Ongoing | — | — |
| Construction of Protective Drain at Yalang Primary School | EU | Shumar | — | Cross Cutting | Ongoing | — | — |
| Construction of RWSS for Sershong & Kulung villages under Nanong Chiwog | EU | Nanong | — | Cross Cutting | Ongoing | — | — |
| Construction of Retaining Wall at Phusumburi | EU | Yurung | — | Cross Cutting | Ongoing | — | — |
| Construction of a new water storage tank, rehabilitation and maintenance of existing pipelines, and fencing of water sources for drinking water supply of angthang, Chimong and Nyasikhar | EU | Chhimoong | — | Cross Cutting | Ongoing | — | — |
| Construction of Permanent structures along the Choongkhar–Bargonpa Farm Road | EU | Zobel | — | Cross Cutting | Ongoing | — | — |
| Construction of RWSS at Bafudhar | EU | Chhoekhorling | — | Cross Cutting | Ongoing | — | — |
| Construction of causeway at Menchu/Lishingzor-Telung farmroad | EU | Dechhenling | — | Cross Cutting | Ongoing | — | — |
| RWSS at Bangyul | EU | Dungmaed | — | Cross Cutting | Ongoing | — | — |
| Construction of retaining walls and slope stabilization works at erosion-prone sections of the farm road in Chongshing Chiwog | EU | Chongshing | — | Cross Cutting | Ongoing | — | — |
| Construction of Culvert Bridge at Re Daza, Tashithangjay Village | EU | Serthig | — | Cross Cutting | Ongoing | — | — |
| Construction of Rural Water Supply System at Lungtsukpa and Rikhey Villages | EU | Dewathang | — | Cross Cutting | Ongoing | — | — |
| Construction of Reshiwoong Rural Water Supply Scheme | EU | Phuentshogthang | — | Cross Cutting | Ongoing | — | — |
| Land Development through consolidation and terracing of Wetland Areas | EU | Langchenphu | — | Cross Cutting | Ongoing | — | — |
| Renovation of Drainage System at Jompa village | EU | Lauri | — | Cross Cutting | Ongoing | — | — |
| Maintainence of road at Morong Yuerteri village | EU | Orong | — | Cross Cutting | Ongoing | — | — |
| Construction of Storm Drain at Pemathang | EU | Pemathang | — | Cross Cutting | Ongoing | — | — |
| Construction of Irrigation channel at Chidungkhar | EU | Gomdar | — | Cross Cutting | Ongoing | — | — |
| Construction of Culvert Bridge and Gabion Wall at Shokshi Chiwog under Wangphu Gewog | EU | Wangphu | — | Cross Cutting | Ongoing | — | — |
| Construction of Irrigation Channel at Wangphu and Chubar | EU | Martshala | — | Cross Cutting | Ongoing | — | — |
| Construction of Flood Protection Wall at Ngangtshothang Maed | EU | Samrang | — | Cross Cutting | Ongoing | — | — |
| Construction of drainage at Sengden to Sanglung farm road | EU | Dophuchen | — | Cross Cutting | Ongoing | — | — |
| Maintenance of chhusilgang irrigation channel at Chhusilgang Dramedsa | EU | Pemaling | — | Cross Cutting | Ongoing | — | — |
| Construction of RCC Wall at Upper Chhirlogsa along Farm Road | EU | Samtse | Samtse | Cross Cutting | Ongoing | — | — |
| Maintenance of Katari RWSS. | EU | Norbugang | — | Cross Cutting | Ongoing | — | — |
| Improvement of Dangling Chiwog Farm Road. | EU | Tashichoeling | — | Cross Cutting | Ongoing | — | — |
| Renovation of Khababgang ORC | EU | Norgaygang | — | Cross Cutting | Ongoing | — | — |
| Maintainence of irrigation canal for Chungthung | EU | Sangacholing | — | Cross Cutting | Ongoing | — | — |
| Construction of RRM Wall and installation of Hume pipe at Tingdungay farm road | EU | Doomtoed | — | Cross Cutting | Ongoing | — | — |
| Maintenance and improvement of water storage tank and supply system to Dechengang | EU | Ugyentse | — | Cross Cutting | Ongoing | — | — |
| Construction of RCC water reserviour tank and distribution line at Jangcholing-Lachuthang | EU | Phuntshopelri | — | Cross Cutting | Ongoing | — | — |
| Construction of Kitchen at Sangay Choling Dratshang | EU | Tading | — | Cross Cutting | Ongoing | — | — |
| Renovation of Pantharaygaon RWSS | EU | Shompangkha | — | Cross Cutting | Ongoing | — | — |
| Protection of Ghodhi Drang Farm Road through installation of hume pipes and RCC slab and supporting walls | EU | Samkhar | — | Cross Cutting | Ongoing | — | — |
| Installation of rainwater harvesting systems and installation of syntax at Zeri, Goethnamthoen, Tshonglinggoenpa and Hrangotshe | EU | Merag | — | Cross Cutting | Ongoing | — | — |
| Construction of Retaining Wall at Pasaphu Road Section | EU | Kangpar | — | Cross Cutting | Ongoing | — | — |
| Retaining Wall Construction at Chongkarmo (RCC Wall) at Changme | EU | Shongphu | — | Cross Cutting | Ongoing | — | — |
| Installation of HDPE irrigation Channel at Poktor Brangsa | EU | Radhi | — | Cross Cutting | Ongoing | — | — |
| Construction of RCC Culvert at Lower Suskumri Kharphu Farm Road | EU | Lumang | — | Cross Cutting | Ongoing | — | — |
| RWSS for Winter Pasturelands at Thrakthri and Joenkhar | EU | Sagteng | — | Cross Cutting | Ongoing | — | — |
| Farm Road Maintenance from Lungdargang to Mongling | EU | Bartsham | — | Cross Cutting | Ongoing | — | — |
| Construction of Irrigation Pipelines from Yemkhar to Dodom Village | EU | Bidungg | — | Cross Cutting | Ongoing | — | — |
| Construction of box culverts along Shingchen Goenpa Farm Road | EU | Kanglung | — | Cross Cutting | Ongoing | — | — |
| Construction of Causeway along Chema Farm Road (Pangthang-Ritsangdung Chiwog) | EU | — | — | Cross Cutting | Ongoing | — | — |
| Construction of Causeway with wall at Jomri (Rongthung Chiwog) | EU | — | — | Cross Cutting | Ongoing | — | — |
| Construction of U-drain at Gewog Staff quarter | EU | Udzorong | — | Cross Cutting | Ongoing | — | — |
| Construction of Wall at Khola Camp | EU | Khaling | — | Cross Cutting | Ongoing | — | — |
| Water source Protection for Darjiling/Ngambinang/Dhaliphangma | EU | Yangnyer | — | Cross Cutting | Ongoing | — | — |
| Construction of Boulder wall and Retaining wall at Mangshukpo | EU | Phongmed | — | Cross Cutting | Ongoing | — | — |
| Construction of River Protection wall at Phakpari | EU | Thrimshing | — | Cross Cutting | Ongoing | — | — |
| Land leveling, teracing and drainage improvement in Shashing and Dalimang | EU | Yangtse | — | Cross Cutting | Ongoing | — | — |
| Construction of intake, tanks, and pipelines at Domtsang Karmazom | EU | Khamdang | — | Cross Cutting | Ongoing | — | — |
| Construction of irrigation drains at Wangringmo | EU | Ramjar | — | Cross Cutting | Ongoing | — | — |
| Construction of retaining Wall on PHC Road | EU | Tongmajangsa | — | Cross Cutting | Ongoing | — | — |
| Construction of causeways at Pangringku Farm Road | EU | — | — | Cross Cutting | Ongoing | — | — |
| Land Development at Draktsa Village | EU | Toedtsho | — | Cross Cutting | Ongoing | — | — |
| Construction of gabion retaining wall at Langthangbuung | EU | Langthil | — | Cross Cutting | Ongoing | — | — |
| Construction of Footpath, Retaining Wall and Drainage System in Korphu Toed and Maed Chiwog | EU | Korphu | — | Cross Cutting | Ongoing | — | — |
| Construction of Main FCR Tank and Distribution of Longchu Drinking Water Supply for Samcholing Khatoe and Samcholing Khamay Chiwogs | EU | Draagteng | — | Cross Cutting | Ongoing | — | — |
| Repair and Maintenance of Chiwog meeting hall and retaining wall at Dorji Goenpa | EU | Nubi | — | Cross Cutting | Ongoing | — | — |
| Construction of Teketing Irrigation | EU | Tangsibji | — | Cross Cutting | Ongoing | — | — |
| Maintenance and Improvement of Irrigation channel at Trashicholing | EU | Pungtenchhu | — | Cross Cutting | Ongoing | — | — |
| Renovation of Galan Irrigation Channel at Bulan irrigation, Tamang Basti, Tsirang | EU | Semjong | — | Cross Cutting | Ongoing | — | — |
| Construction of Permanent Structures along the Gewog Center to Norjangsa Farm Road | EU | Dunglagang | — | Cross Cutting | Ongoing | — | — |
| Maintenance of Irrigation channel at Wangphu chiwog | EU | Tsirang Toed | Tsirang | Cross Cutting | Ongoing | — | — |
| Road protection and landslide mitigation at Paray Kholshi, Gomsum Chiwog, Tsholingkhar Gewog, Tsirang. | EU | Tsholingkhar | — | Cross Cutting | Ongoing | — | — |
| Construction of Gabion Wall at Baardara to Gosarling Primary School Farm Road | EU | Gosarling | — | Cross Cutting | Ongoing | — | — |
| Construction of Retaining Wall at Sergithang - Teendovaney Farm Road | EU | Sergithang | — | Cross Cutting | Ongoing | — | — |
| Maintainence of Drinking Water Supply at Dharchargang village | EU | Rangthangling | — | Cross Cutting | Ongoing | — | — |
| Improvement of Barshong Maed and Chunniykhang Farm Road | EU | Barshong | — | Cross Cutting | Ongoing | — | — |
| Maintenance of Irrigation Channel through HDPE Pipe Installation from Chugasa to Goeshikha | EU | Gase Tshowogm | — | Cross Cutting | Ongoing | — | — |
| Construction retaining wall and slope stabilization through spring box system at the meeting hall, Chegip Goendep | EU | Kazhi | — | Cross Cutting | Ongoing | — | — |
| Maintenance of Pasakha - Drabchay irrigation channel. | EU | Gase Tshogongm | — | Cross Cutting | Ongoing | — | — |
| Installation of HDPE pipe at Bjaphu Gonpa(Continuation of previous project) | EU | Ruebisa | — | Cross Cutting | Ongoing | — | — |
| Construction of Bridge at Taksha | EU | Darkar | — | Cross Cutting | Ongoing | — | — |
| Laying of Stone soling at Nimdrosa and Tangkhagarey farm road | EU | Phobji | — | Cross Cutting | Ongoing | — | — |
| Maintenance of Zawa Irrigation channel | EU | Athang | — | Cross Cutting | Ongoing | — | — |
| Maintenance of Baychu Irrigation Channel from Zewagang to Poktokarpo at Wangjokha & Thangoo | EU | Thedtsho | — | Cross Cutting | Ongoing | — | — |
| Construction of Waste disposal pit at Lamsaigang | EU | Dangchhu | — | Cross Cutting | Ongoing | — | — |
| Construction of causeway and drain at Mewangang Chiwog | EU | Goshing | — | Cross Cutting | Ongoing | — | — |
| Construction of two Retaining wall at Shingkhar-Radhi Farm road | EU | Shingkhar | — | Cross Cutting | Ongoing | — | — |
| Construction of Retaining Wall at Gojong, Pongchula Chiwog | EU | Phangkhar | — | Cross Cutting | Ongoing | — | — |
| Dorjilung Hydro Power Project | WBG | DGPC; MoENR | Lhuentse, Mongar | Energy | Unknown | USD 515.0m | NA – NA |
| Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value Chains | WB | MoAL; MoENR; BFDA | — | Agriculture/ Forestry | Unknown | USD 34.5m | 30 Sept, 2030 |
| Bhutan Climate and Disaster Resilience Development Policy Financing with a Catastrophe Deferred Drawdown Option | WB | MoF | — | Cross-cutting – Climate Change, Disaster Risk Management | Unknown | USD 40.0m | — |
| Strengthening Risk Information for Disaster Resilience in Bhutan | WB | MoHA; MoIT; MoH | — | Cross-cutting – Climate Change, Disaster Risk Management | Unknown | USD 5.0m | — |
| Bhutan Green Transport Project (BGTP) | WB, Korea- WB Partnership Facility (KWPF), GCF | Thimphu Thromde; MoF | Thimphu | Transport | Unknown | USD 29.5m | — |
| Sustainable Hydropower Development Project | WB | DGPC | — | Energy | Unknown | USD 4.3m | — |