All projects

The complete published project register. Select a column to sort, or narrow the list below.

Figures as of 21 October 2026

View as dashboard

275 projects · select a column to sort

Implementing entityDzongkhagSectorPeriod
Improvement of Sengore - Dramaling Road (PNH)GoIMoIT——Completed——
Improvement of Haa-Samtse SNHGoIMoIT——Ongoing——
Improvement of Samtse-Norbugang SNHGoIMoIT——Ongoing——
Improvement of Dzongkhag RoadsGoIMoIT——Ongoing——
Establishment of National Weather and Flood Warning Center (NWFWC) and scientific facilities, ThimphuGoINCHM; MoENR—Cross CuttingOngoing—2024–2029
Construction of Waste Material recovery facility and incineratorGoIMoENR—Cross CuttingOngoing—2024–2029
Support to Solar and wind ProjectsGoIMoENR—Cross CuttingOngoing—2024–2029
Support to mini and micro hydropower projectGoIMoENR—Cross CuttingOngoing—2024–2027
Project for Capacity Enhancement of Meteorological Observation, Forecasting and Flood Warning, for Disaster Preparedness and Response in Thimphu and Paro River BasinsJICANCHM—Disaster Risk ReductionCompleted—31-12-24
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Small Scale Sewerage System with Energy Saving TechnologyJICA——Water, SanitationCompleted—30-08-19
Technology transfer project related to waste proper management in Thimphu City, Kingdom of BhutanJICA——Environment, SanitationCompleted—14-08-17 – 15-04-21
SDGs Business Verification Survey with the Private Sector for Road-Slide Slope Disasters Countermeasure Technologies and Methods in the Kingdom of BhutanJICA——Disaster Risk ReductionCompleted—15-06-23
Data Collection survey for formulation recycling society upon Waste Management.JICA——Environment, SanitationCompleted—14-07-21 – 31-03-22
Data Collection Survey on Forest Information ManagementJICA——ForestryCompleted—31-03-26
Waste Management Workshop towards Development of a Material Recycle Facility in Landfill Site at ParoJICA——Environment, SanitationCompleted—31-03-26
Activity for Disaster Management and Contingency PlanJICA——Disaster Risk ReductionCompleted—31-03-26
Project for Capacity Development on Countermeasures of Slope Disaster on Roads in BhutanJICA——Disaster Risk ReductionCompleted——
Procurement of Landslide Countermeasure Related Equipment (Japan's grant aid for the Economic and Social Development Fund)JICA——Disaster Risk ReductionOngoing—30-04-26 – 30-04-28
Project for Capacity Development in Landslide Risk ReductionJICA——TransportOngoing—30-04-29
The Project for Strengthening Forest Management Capabilities Using Data and Digital TechnologyJICA——ForestryPipeline—30-03-31
Waste Management Capacity Development AdvisorJICA——Environment, SanitationOngoing—17-02-25 – 16-02-27
Hydropower Technical AdvisorJICA——Renewable EnergyOngoing——
Enhancing sustainability and climate resilience of forest and agriculture landscape and community livelihood (NAPA III)GEFGNHCS; MoF; MoAL; MoIT; MoENRBumthang, Haa, Mongar, Paro, Sarpang, Thimphu, Trongsa, Zhemgang, Wangdue PhodrangAgriculture, Livestock, ForestryCompletedUSD 13.9mSept 2023
Supporting Climate Resilience and Tranformational Change in the Agriculture Sector in BhutanGCFGNHCS; MoF; MoAL; MoIT; MoENRDagana, Punakha, Samtse, Sarpang, Trongsa, Tsirang, Zhemgang, Wangdue PhodrangAgriculture, Forestry, Cross CuttingCompletedUSD 25.3m—
Bhutan for LifeGCFBFL Secretariat; MoENR—Forestry, Cross CuttingOngoingUSD 26.6m2018–2032
Climate Adaptation, Resilience and Engagement in Local Government (CARE-LG)GCFDPBP; MoF; MoENR; MoHA—Cross CuttingOngoingUSD 10.0m2025–2029
Advancing Climate Resilience in Water Sector in Bhutan (ACREWAS)GEFDoID; MoIT; MoENR; MoALGasa, Punakha, TsirangWater, Cross CuttingOngoingUSD 8.9m2023–2028
Mainstreaming Biodiversity into the Tourism Sector in Bhutan (ecotourism)GEFDOTourism MOICE; MoENR; MoALLhuentse, Mongar, Zhemgang, Tashigang, Tashi YangtseTourism, Biodiversity, Cross CuttingCompletedUSD 4.8mSept 2021
Productive and Sustainable Food Systems in Bhutan for Environmental Benefits and Gross National Happiness (FSP)GEFMoAL; MoENRLhuentse, Mongar, Pemagatshel, Samdrup Jongkhar, Tashigang, Tashi YangtseFood, Agriculture, Forestry, Cross CuttingOngoingUSD 10.3m2025–2030
Enhancing the Climate Resilience of Urban Landscapes and Communities in Thimphu-Paro region of Bhutan (ECRUL)GEFDHS; MoIT; MoENR; MoICE; MoFParo, ThimphuWater, Human Settlement, Forest Fire, Corss-cuttingOngoingUSD 20.0m2025–2031
Adaptation to Climate-induced Water Stresses through Integrated Landscape Management in BhutanAFDoW; MoENR; MoIT; MoALDagana, Paro, TsirangWaterOngoingUSD 9.9m2023–2028
Innovative adaptation financing to build the resilience and adaptive capacity of smallholder farmers in Bhutan (InAF-Bhutan)AFDoA; MoAL; Insurance companiesDagana, Lhuentse, Tsirang, TashigangAgriculture, Cross CuttingOngoingUSD 5.0m2025–2030
Securing Water and Enhancing Climate Resilience in Thimphu District, BhutanAFThimphu Dzongkhag; BES; DoW; MoENR; MoAL; MoITThimphuWater, Agriculture, Cross CuttingPipelineUSD 5.0m2027–2030
Building Resilient commercial Smallholder Agriculture (BRECSA) projectIFAD, GAFSPDoA; MoALSarpang, Trongsa, Tsirang, ZhemgangAgriculture, Livestock, ForestryOngoingUSD 19.3m2023–2030
Food Security and Agriculture Productivity (FSAPP)GAFSPDoA; MoALDagana, Haa, Samtse, Sarpang, ChhukhaAgriculture, Livestock, ForestryCompletedUSD 12.6m2017–2025
Commercial Agriculture and Resilient Livelihoods Enhancement Programme (CARLEP)IFADDoA; MoALLhuentse, Mongar, Pemagatshel, Samdrup Jongkhar, Tashigang, Tashi YangtseAgriculture, Livestock, ForestryCompletedUSD 31.5m2015–2025
Accelerating Decarbonization: Closing the Energy Gap through Market-Driven Solar Power Solutions (Euro 18.720)MAFDOE; MoENR; MoH; BPC; ERA; Banks; BTFEC; RMA; MoF—EnergyPipelineUSD 20.1m—
Accessing Bhutan’s Biological Resources through Sustainable Conservation, Community Empowerment and capacity building under Nagoya Protocol (NBSAP)GEFNBC—BiodiversityOngoingUSD 450k2025–2028
Small Grant Program (SGP) during GEF Operational Phase 5, 6, 7GEFUNDP; CSOs and CBOs—Cross CuttingOngoingUSD 1.9m2010–2026
Enabling the Kingdom of Bhutan to prepare 4th National Communication and 1st and 2nd BTRGEFDECC; MoENR—Cross CuttingOngoingUSD 1.2m2023–2027
Strengthening institutional and technical capacities for enhanced transparency in implementation and monitoring of Bhutan?s Nationally Determined Contribution (NDC) (CBIT) (MSP)GEFDECC; MoENR—Cross CuttingOngoingUSD 1.8m2021–2026
National Reporting under the UNCCD with Support for Enhanced Data/ReportingGEFNSSC; MoAL—Land, Cross CuttingOngoingUSD 120k2025–2026
Support to Preparation of the Fifth National Reports on the Implementation of the Cartagena Protocol on BiosafetyGEFBFDA; MoH—Cross CuttingOngoingUSD 33k2025–2026
Support for Preparation of the First National Report on the Implementation of the Nagoya ProtocolGEFNBC; MoAL—Cross CuttingOngoingUSD 33k2025–2026
Enhancing institutional capacity for effective mainstreaming and implementation of NBSAPKBFNBC; MoAL—Biodiversity, Cross CuttingCompletedUSD 200k—
Enhancing risk-informed planning, data-driven decision making and early warning system for disaster-resilient urban infrastructure in major cities of Bhutan- Coalition for Disaster Resilient Infrastructure (CDRI)CDRIMoITThimphuUrban Resilience, Cross CuttingOngoingUSD 745k2025–2027
Building Adaptive Capacity through Innovative Management of Pests/Disease and Invasive Alien Species (IAS) in Bhutan to Enhance Sustainable Agro-Biodiversity and LivelihoodsAFDECC; MoENRMongarInvasive Species ControlOngoingUSD 250k2022–2027
Bhutan Livable and Resilient Cities Project (LRCP)GCF, World BankDHS; MoITThimphuTransport, Water, Infrastructure, Cross CuttingPipelineUSD 48.0m—
GEF-8 OFP Oversight Support Project- 31,445GEF——Cross CuttingOngoingUSD 31k—
“Strategic framework to strengthen the Capacity of NDA to access resources from the Green Climate Fund and support for direct access accreditation process” (BTN-RS-001)GCFGNHC—Cross CuttingCompletedUSD 400k—
“Strengthening NDA and related institutions, including financial institutions, in Bhutan for effective engagement with GCF” (BTN-RS-003)GCFGNHC—Cross CuttingCompletedUSD 299k—
"Preparation of the National Adaptation Plan (NAP) for Bhutan with a focus on implementation of comprehensive risk management in the water sector” (BTN-RS-002)GCFNEC—Cross CuttingCompletedUSD 3.0m—
Strengthening REDD+ and watershed management in Bhutan (BTN-RS-004)GCFMoAF—Cross CuttingCompletedUSD 595k—
Building the Capacity of Bhutan’s National Stakeholders to Address Climate and Disaster Related Risks (BTN-RS-005)GCFDMDF; NCHM—Cross CuttingCompletedUSD 975k—
Strengthening capacities and enhancing climate data and services in Bhutan to scale-up climate financing from multiple sources (BTN-RS-006)GCFRSPN—Cross CuttingCompletedUSD 991k—
Preparation of Bhutans NDC 3.0 and enhancedstrategies, systems and in-country capacities toachieve its climate objectives and targets (BTN-RS-007)GCFDECC—Cross CuttingOngoingUSD 900k2025–2027
Enhancing Climate Information and Multi-Hazard Early Warning for Resilience in BhutanGCFNCHM; MoENR; MoIT; private sectors—Early Warning System, Cross CuttingPipelineUSD 22.0m—
Strengthening Adaptation and Flood and Landslide Early Warning for the HKH (SAFE NIB) – a regional project proposal (Bhutan, Nepal and India).AFMoIT; NCHM; DLGDM—Early Warning System, Cross CuttingPipelineUSD 30.0m—
Integrated Drought Management for South Asia (29.766)AFNCHM; DoW; DoA; NSSC—Drought ManagementPipelineUSD 29.8m—
Least Developed Countries (LDC) Initiative for Effective Adaptation and Resilience (LIFE-AR)AFDECC; MoENR—Cross CuttingPipelineUSD 5.0m—
Climate-Resilient Wildfire Prevention and Adaptive Landscape Management in BhutanAFDoFPS; MoENR—Forest FirePipelineUSD 5.0m—
CIF Accelerating Resilience Investments and Innovations for Sustainable Economies Investment Program (ARISE Program)CIFDoW; MoENR; MoIT—Water, Cross CuttingPipelineUSD 30.0m—
SCALE: Scaling Climate Adaptation through Local Enterprises: Adaptation Finance Pathway for Vulnerable Mountain Communities in Bhutan and NepalAFMoF; RMA; FIs—Cross CuttingPipelineUSD 5.0m—
Improving Food Security in the Himalayas through Integrated Nature-based Solutions for Water, Productive Renewable Energy, and Climate-Resilient Agriculture (HI-ADAPT)AFMoENR; MoAL—Cross Cutting, Food, NbS, AgricutlurePipelineUSD 29.9m—
HI-RANGE: Enhancing the climate resilience of rangeland ecosystems and pastoral livelihoods in the Hindu Kush Himalaya region.AFMoENR; MoAL—Cross Cutting, Food, NbS, AgricutlurePipelineUSD 30.0m—
Strengthening Climate Resilience across Bhutan’s Mountain and Downstream LandscapesGCFTarayana Foundation; MoAL; MoENR; MoIT—Agriculture, NbS, Food, Cross CuttingPipelineUSD 30.0m—
Sustainable Management and Advancing Agricultural Resilient Transformation (SMAART)GAFSPMoALChhukha, Dagana, Haa, Punakha, Samtse, Wangdue PhodrangAgriculture, NbS, Food, Cross CuttingPipelineUSD 17.2m—
Green and Resilient Affordable Housing ProjectADBNHDCLPemagatshel, Samdrup Jongkhar, Samtse, Thimphu, Tashi YangtseEnergy-efficiencyOngoingUSD 30.0m—
Solar Farm Expansion projectADBDGPC & BPCBumthang, LhuentseEnergy-efficiencyOngoingUSD 160.5m—
Inclusive and Resilient Urban Development ProjectADBPT & NHCDLThimphuWater, SanitationOngoingUSD 13.0m—
Renewable Energy for Climate Resilience ProjectADBDept—EnergyOngoingUSD 18.3m—
Distributed Solar for Public Infrastructure ProjectADBDGPCTrongsaEnergyOngoing——
Climate-Resilient Omchhu River Basin ProjectADBPhuentsholing Thromde—Climate ResilienceOngoing——
Building Adaptation & Resilience in HKHADBADB; P——Ongoing——
Water Flagship Program Support ProjectADBDoID; MoITChhukha, Mongar, Thimphu, Wangdue Phodrang, ZhemgangWater & SanitationOngoing——
Establishment of Permanent Biodiversity Monitoring Plot for Education and Conservation StudiesBTFECSherubtse College; Royal University of BhutanTashigangBiodiversity ConservationOngoing——
Integrating Conservation and Community Livelihoods Through Holistic Management of Biological Corridor 9BTFECTrashigang Divisional Forest; DoFPS; MoENRTashigang, Tashi YangtseForestryOngoing——
Zero Waste Initiative: Adopting Circular Solutions for Sustainable Water Management in Denchhi ThromBTFECPemagatshel Dzongkhag AdministrationPemagatshelWasteOngoing——
Enhancing agriculture in Tsephu village through innovative and climate resilient solar irrigation infrastructureBTFECPunakha DzongkhagPunakhaCross-cutting: Agriculture, WaterOngoing——
Installation of Solar Water Heater SystemBTFECMoESD—EnergyOngoing——
Gyalsung Environment ManagementBTFECGyalsung Headquarters—WasteOngoing——
Domestication of high-value wild edible mushrooms through the support of a research facilityBTFECNational Mushroom Centre; Department of Agriculture; Ministry of Agriculture and Livestock (MoAL)ThimphuAgricultureOngoing——
Solar Wellness for MonksBTFECSerlung Goenzin Dhuedhey Lungtog Choeling; Zhung DratshangParoEnergyCompleted——
Beyond Honey: Climate-smart Apiculture for Ecosystem Services, Sustainable Food Production and Biodiversity ConservationBTFECNational Livestock Research Center; Bumthang; Department of Livestock; MoAL—AgricultureOngoing——
Improving conservation decision-making in Bhutan with environmental DNA: A Strategic Initiative towards Achieving 30X30 Conservation GoalsBTFECDoFPS; MoENRPunakhaForestryOngoing——
Participatory on-farm conservation and sustainable use of native horticulture crop diversityBTFECNBCTrongsa, Zhemgang, Tashigang, ChhukhaAgricultureOngoing——
Feasibility Assessment for Ecotourism Development Strategy of Phibsoo Wildlife Sanctuary and Royal Manas National Park.BTFECGMC—EcotourismOngoing——
Drinking Water Supply Improvement for Jurmey Gewog.BTFECMongar DzongkhagMongarWater & SanitationOngoing——
Turning Waste into Resources: Establishment of a Community Waste Drop-off and Recycling Centre in Pemathang GewogBTFECSamdrupjongkhar Dzongkhag—WasteOngoing——
Rainwater Harvesting System for Five Student Hostels at the College of Science and Technology (CST) Campus.BTFECCollege of Science and Technology; Royal University of Bhutan—Water & SanitationOngoing——
Livelihood Enhancement of Chudthak Community through Climate-Resilient and Nature-Based Approaches.BTFECTrashigang DzongkhagTashigang—Ongoing——
Climate-resilient water management for sustainable agriculture in Changsima village, Hungrel Gewog, ParoBTFECParo DzongkhagParoCross Cutting, Water, AgricultureCompleted——
Optimizing agriculture land and climate resilient through solar lift irrigation for Bali Chiwog, Chubu Gewog-Punakha DzongkhagBTFECPunakha DzongkhagPunakhaCross Cutting, Water, AgricultureCompleted——
Preventing extirpation of musk deer in BhutanWWFDoFPS; MoENR—ConservationOngoingUSD 335k—
Zero Poaching in Bumthang Forest DivisionWWFBumthang Forest Division; DoFPS; MoENRBumthang, TrongsaConservationUnknownUSD 80k—
Edge Species Protection Through Habitat Improvement & Fostering Positive Relations with the CommunityWWFDoFPS; MoENRHaa, ParoConservationOngoingUSD 95k—
Managing Human-Tiger Coexistence for the Long Term in BhutanWWFBhutan Tiger Center and Zhemgang Forest DivisionTrongsa, ZhemgangForestryCompletedUSD 180k—
Climate Crowd Phase I- Improvement and Rehabilitation of Water Intake and Distribution System in Langchenphu and Samrang Community.WWFDoFPS; MoENR—Cross Cutting, Water, ForestryCompletedUSD 70k—
Climate Crowd Phase II- Strengthening resilience of communities and wildlife in Jomotsangkha Wildlife Sanctuary, BhutanWWFDoFPS; MoENR—Cross Cutting, Agriculture, LivelihoodOngoingUSD 95k—
Tiger Impact CertificateGlobal Tiger Innovation Fund (WWF-Australia)WWF-BhutanTrongsaConservationOngoingUSD 70k—
Wildinsync eDNA in BhutanWWF-Bhutan, ETH ZurichDoFPS; MoENR; CNR; RUB—BiodiveristyPipelineUSD 223k—
Living Landscapes: Securing High Conservation Values in Southwestern BhutanIKIWWF-Bhutan and DoFPS; MoENR; Tarayana Foundation; National Land Commission Secretariat; Ministry of Agriculture and Livestock and Ministry of FinanceDagana, Haa, Paro, Samtse, Sarpang, Thimphu, Tsirang, Zhemgang, ChhukhaBiodiveristyOngoingUSD 7.2m—
Advancing Climate-Smart Agriculture Development and Rural Livelihood Opportunities in Zhemgang DistrictBhutan FoundationZhemgang District administration & Khengrig Namsum CooperativeZhemgangCross Cutting, Agriculture, LivelihoodOngoing——
Promoting Ecological and Commnity Engagement (PEaCE) for Snow Leopard Conservation in BhutanBhutan FoundationDepartment of Forest and Park Services; Nature Conservation Division & Thimphu DzongkhagHaa, ThimphuConservationOngoing——
Status of Pangolins in Royal Manas National Park and their Conservation through Multi-stakeholder EngagementBhutan FoundationDoFPS; MoENR—ConservationCompleted——
Empowering Dagala Pastoralists through Improved Yak Dairy Processing and Value AdditionBhutan FoundationThimphu Dzongkhag—Cross Cutting, Livestock, LivelihoodPipeline——
Enhancing Agriculture productivity of Smallholder Farmers through Innovation and Farm Mechanization.Bhutan FoundationSamdrupjongkhar Initiative—AgricultureCompleted——
Empowering rural communities through Agri-product innovation and local Enterprise DevelopmentBhutan FoundationTarayana FoundationMongar, TashigangAgricultureCompleted——
Planet Satellite Data and Imagery to Support Bhutan’s Climate and Environmental Goals - Project CentinelaBhutan FoundationNLCS; GMCA; DHS; DoW; DoFPS; CNR; WWF-Bhutan; NSB; NCHM——Ongoing——
Enhancing livestock productivity through Restoration of Degraded Pastureland in Gogona community.Bhutan FoundationGogona Diary Cooperatives with Technical support from District livestock Sector—Cross Cutting, Livestock, AgricultureOngoing——
Revitalization and Income Support Effort (RISE) for Samcholing Tea CommunityBhutan FoundationTrongsa Dzongkhag and Samcholing Tea CoopoerativesTrongsaCross Cutting, Agriculture, LivelihoodOngoing——
Sustaining an Abundance of Forest Ecosystems (SAFE) InitiativeAFoCO / UNEPDoFPS—ForestryOngoingUSD 59k—
Sustainable Community-Based Enterprises for Improved Livelihood in BhutanAFoCODoFPS—ForestryOngoingUSD 1.0m30-06-20 – 31-12-25
Restoring Fire-Damaged Ecosystems and Enhancing Wildland-Urban Interface Resilience in BhutanAFoCODepartment of Forests and Park Services (DoFPS—ForestryOngoingUSD 1.2m30-06-30
Sustainable Community-Based Enterprises for Improved Livelihood in BhutanAFoCODoFPS—ForestryCompletedUSD 1.0m30-06-20 – 31-12-25
Improved Local Community Livelihoods Through Increased Income from Non-Timber Forest Products (NTFPs)AFoCODoFPS—ForestryOngoingUSD 200k—
Production of Commercial Biogas from Household Waste (BES)SAARC Development Fund (SDF)Bhutan Ecological Society (BES)—Energy / WasteOngoingUSD 449k—
Demonstration of Municipal Solid Waste Composting in MemelekahInstitute for Global Environmental Strategies (IGES)Thimphu ThromdeThimphuWasteCompletedUSD 47k13-02-25 – 29-08-25
Pilot Project on the Creation of an Organic Recycling Loop in Paro, BhutanInstitute for Global Environmental Strategies (IGES)Paro Dzongkhag AdministrationParoWasteOngoingUSD 20k30-11-27
National Soil Information Systems to Support the Transformation of Agrifood Systems (Soil Phase 2)Asian Food and Agriculture Cooperation Initiative (AFACI)National Soil Services Centre (NSSC)—AgricultureOngoingUSD 90k—
Inclusive markets, Production, Agricultutural Commercialization and Transformation project (IMPACT)IFAD LoanPMU; NLRC; BFDA KIL; BAILBumthang, Lhuentse, Mongar, Pemagatshel, Samdrup Jongkhar, Tashigang, Tashi YangtseAgricultureOngoingUSD 10.0m30/06/2032
Commercial Agriculture And Resilient Livelihoods Enhancement Program (CARLEP)International Fund for Agriculture Development (IFAD)Office of the Program Management; Ministry of Agriculture and Livestock; Co-located at ARDC-Wengkhar; Koufuko International Ltd; BAILLhuentse, Mongar, Pemagatshel, Samdrup Jongkhar, Tashigang, Tashi YangtseAgricultureCompletedUSD 25.5m11/12/1015 – 31/12/2025
Construction of FCR tank and water source protection through chain link fencing at Rijuk DawathangEUMoHA; Chhoekhor—Cross CuttingOngoing——
Construction of 165m Irrigation Channel at Nimlung under Kidzom ChiwogEUTang—Cross CuttingOngoing——
Maintenance and Protection of Gaytsa Buli Water SourceEUChhumig—Cross CuttingOngoing——
Construction of Water Reserviour Tank at Ura DozhiEUUra—Cross CuttingOngoing——
Construvtion of FCR tank at Chapcha Primary School water source, replacement of damaged HDPE pipelines, and procurement of a 2000-liter Syntax tank at Gewog Office.EUChapchha—Cross CuttingOngoing——
Improvement of intake structures, replacement of deteriorated HDPE pipelines and construction of FCR tank at Pamji water sourceEULoggchina—Cross CuttingOngoing——
Construction of retaining wall along Pangu farm roadEUMaedtabkha—Cross CuttingOngoing——
Maintenance of irrigation channel at MondokhaEUDoongna—Cross CuttingOngoing——
RWSS at lower Pakchina, under Samphelling GewogEUSamphelling—Cross CuttingOngoing——
Maintenance of Irrigtion Channel at Damji villageEUBongo—Cross CuttingOngoing——
Construction of Irrigation Drain at MebisaEUBjabcho—Cross CuttingOngoing——
RWSS in ChongaykhaEUGeling—Cross CuttingOngoing——
Construction of Catch Pits along Ambithang Chiwog Farm RoadEUDrukjeygang—Cross CuttingOngoing——
Tashiding-Integrated Wetland Irrigation enhancement through installation of HDPE Pipeline within the command area of Chain Link FencingEUTashiding—Cross CuttingOngoing——
Improvement of Dreychu Irrigation Channel in Namzhigang, BartsaEUKarna—Cross CuttingOngoing——
Construction of Causeway and Drain at Samarchu (Dharay)EUTsenda-Gang—Cross CuttingOngoing——
Maintenance of Sarkhari Irrigation ChannelEUGozhi—Cross CuttingOngoing——
Construction of protection wall for Sampang irrigational channelEULhamoi Dzingkha—Cross CuttingOngoing——
Improvement of Farm Road at Jemathang Farm RoadEUKarmaling—Cross CuttingOngoing——
Construction of causeway with wall at Balukhop, Tsalabji chiwogEUDorona—Cross CuttingOngoing——
Maintenance of Tanju Irrigation channel at TanjuEUGesarling—Cross CuttingOngoing——
Maintenance of RWSS (HDPE Pipe) at Wopathangka, Kuchuna and BazingkhaEUTseza—Cross CuttingOngoing——
Construction of Nangba to Dorothang Irrigation ChannelEULargyab—Cross CuttingOngoing——
Maintainance of Zinchella Water Supply SchemeEUTsangkha—Cross CuttingOngoing——
Renovation of Gangatey Irrigation Channel (1.5KM)EUNichula—Cross CuttingOngoing——
Construction of retaining wall and drainage system at Chongra LubchaEULaya—Cross CuttingOngoing——
Construction of Drainage System and Installation of Hume Pipes at Tsheringkha ChiwogEUKhatoed—Cross CuttingOngoing——
Construction of Irrigation Channel at ZominaEUKhamaed—Cross CuttingOngoing——
Construction of Riverbank Protection Wall at Lunana Gewog.EULunana—Cross CuttingOngoing——
Construction of wooden bridge at Janaphakha over the Yakchu River.EUBji—Cross CuttingOngoing——
Construction of Retaining wall at NakhaEUSangbay—Cross CuttingOngoing——
Improvement of Irrigation Infrastructure through Construction of 110- Meter Channel from Bozolom to Taktsena, Dorithasa Chiwog.EUGakiling—Cross CuttingOngoing——
Construction of Water Reservoir Tank for Fire Risk Reduction at Dranadingkha Lhakhang.EUKar-tshog—Cross CuttingOngoing——
Construction of RWSS at LamjogangEUSamar—Cross CuttingOngoing——
Spring Shed Management for revival of water source at YokpalingEUMaedtsho—Cross CuttingOngoing——
Restoration of RWSS at Murmur Village.EUMaenbi—Cross CuttingOngoing——
Revival and Development of lake- Tshoi LungpaEUJarey—Cross CuttingOngoing——
Land Development at JasabiEUKurtoed—Cross CuttingOngoing——
Sustainable Land Management at Gonyid–WamburEUTsaenkhar—Cross CuttingOngoing——
Improvement of farm road at ZhamlingEUGangzur—Cross CuttingOngoing——
Construction of 3KM L drain along Thumbari farm roadEUNgatshang—Cross CuttingOngoing——
Intake and channel improvement, drainage works, water source strengthening, and integrated pest management at SelkharEUBalam—Cross CuttingOngoing——
RWSS at Thuenmong-TokariEUTsamang—Cross CuttingOngoing——
RWSS at Tsalabi-Oloki Chiwog, Neykolog-Nanaric Chiwog and, Phogsothong-Shingchongri Chiwog.EUKengkhar—Cross CuttingOngoing——
Tsaburi Grid-Powered Lift Irrigation SchemeEUShermuhoong—Cross CuttingOngoing——
Construction of RCC Reservoir Tank and Distribution Line at BoucholingEUThang-Rong—Cross CuttingOngoing——
Construction of Reservoir Water Tanks at Pam – Dungsingma, Yetong - Jarshingpoktor Chiwog, Kharnang Chiwog and Yangrapungshing Chiwog.EUChagsakhar—Cross CuttingOngoing——
Maintenance and Renovation of Kurizampa RWSS under Chhaling GewogEUChhaling—Cross CuttingOngoing——
Rural Water Supply Scheme for Gomchu ChiwogEUNarang—Cross CuttingOngoing——
Construction of a water storage reservoir in Kidheykhar ChiwogEUMonggar—Cross CuttingOngoing——
Improvement of drainage infrastructure, installation of hank pipes for sewage management, and reclamation of fallow land in Drametse GewogEUDramedtse—Cross CuttingOngoing——
Sustainable Dry Land Irrigation at Kaling ThumlingEUTsakaling—Cross CuttingOngoing——
Bench Terracing at TshegpaEUJurmed—Cross CuttingOngoing——
Development of Menchu shed at KhamjilaEUDrepoong—Cross CuttingOngoing——
Construction of Storm Drainage system at Rashigang Primary School.EUNagya—Cross CuttingOngoing——
Improvement of RWSS at Ramcheytsekha and Extension to Chunjey through Construction of Reservoir Tank and Pipeline Installation.EUTsento—Cross CuttingOngoing——
Maintenance of Farm Road along with Irrigation Channel at Atsho and Chubar Dong Ra under Atsho -Phunub and Chubar VillagesEUDoteng—Cross CuttingOngoing——
Improvement of farm road at Jookha JangsaEUDopshar-ri—Cross CuttingOngoing——
Renovation of Irrigation channel at Dochorten-NeyphuEUShaba—Cross CuttingOngoing——
(River Bank Protection Wall (Boulder Barrier Wall) at Rema Tsekha)EULamgong—Cross CuttingOngoing——
Construction of kitchen and toilet at Dawakha NekhangEUDokar—Cross CuttingOngoing——
Construction of irrigation channel from Paljorling to ChangsimaEUHoongrel—Cross CuttingOngoing——
Construction of reservior tank at ChumeydingkhaEULoong-nyi—Cross CuttingOngoing——
Construction of Irrigation Channel at Geptay under Wangchang GewogEUWangchang—Cross CuttingOngoing——
Rural Water Supply Scheme for Phadhi VillageEUKhar—Cross CuttingOngoing——
Construction of retaining wall at Lungtshering Drangnang under Menchu ChiwogEUNorboogang—Cross CuttingOngoing——
Construction of Protective Drain at Yalang Primary SchoolEUShumar—Cross CuttingOngoing——
Construction of RWSS for Sershong & Kulung villages under Nanong ChiwogEUNanong—Cross CuttingOngoing——
Construction of Retaining Wall at PhusumburiEUYurung—Cross CuttingOngoing——
Construction of a new water storage tank, rehabilitation and maintenance of existing pipelines, and fencing of water sources for drinking water supply of angthang, Chimong and NyasikharEUChhimoong—Cross CuttingOngoing——
Construction of Permanent structures along the Choongkhar–Bargonpa Farm RoadEUZobel—Cross CuttingOngoing——
Construction of RWSS at BafudharEUChhoekhorling—Cross CuttingOngoing——
Construction of causeway at Menchu/Lishingzor-Telung farmroadEUDechhenling—Cross CuttingOngoing——
RWSS at BangyulEUDungmaed—Cross CuttingOngoing——
Construction of retaining walls and slope stabilization works at erosion-prone sections of the farm road in Chongshing ChiwogEUChongshing—Cross CuttingOngoing——
Construction of Culvert Bridge at Re Daza, Tashithangjay VillageEUSerthig—Cross CuttingOngoing——
Construction of Rural Water Supply System at Lungtsukpa and Rikhey VillagesEUDewathang—Cross CuttingOngoing——
Construction of Reshiwoong Rural Water Supply SchemeEUPhuentshogthang—Cross CuttingOngoing——
Land Development through consolidation and terracing of Wetland AreasEULangchenphu—Cross CuttingOngoing——
Renovation of Drainage System at Jompa villageEULauri—Cross CuttingOngoing——
Maintainence of road at Morong Yuerteri villageEUOrong—Cross CuttingOngoing——
Construction of Storm Drain at PemathangEUPemathang—Cross CuttingOngoing——
Construction of Irrigation channel at ChidungkharEUGomdar—Cross CuttingOngoing——
Construction of Culvert Bridge and Gabion Wall at Shokshi Chiwog under Wangphu GewogEUWangphu—Cross CuttingOngoing——
Construction of Irrigation Channel at Wangphu and ChubarEUMartshala—Cross CuttingOngoing——
Construction of Flood Protection Wall at Ngangtshothang MaedEUSamrang—Cross CuttingOngoing——
Construction of drainage at Sengden to Sanglung farm roadEUDophuchen—Cross CuttingOngoing——
Maintenance of chhusilgang irrigation channel at Chhusilgang DramedsaEUPemaling—Cross CuttingOngoing——
Construction of RCC Wall at Upper Chhirlogsa along Farm RoadEUSamtseSamtseCross CuttingOngoing——
Maintenance of Katari RWSS.EUNorbugang—Cross CuttingOngoing——
Improvement of Dangling Chiwog Farm Road.EUTashichoeling—Cross CuttingOngoing——
Renovation of Khababgang ORCEUNorgaygang—Cross CuttingOngoing——
Maintainence of irrigation canal for ChungthungEUSangacholing—Cross CuttingOngoing——
Construction of RRM Wall and installation of Hume pipe at Tingdungay farm roadEUDoomtoed—Cross CuttingOngoing——
Maintenance and improvement of water storage tank and supply system to DechengangEUUgyentse—Cross CuttingOngoing——
Construction of RCC water reserviour tank and distribution line at Jangcholing-LachuthangEUPhuntshopelri—Cross CuttingOngoing——
Construction of Kitchen at Sangay Choling DratshangEUTading—Cross CuttingOngoing——
Renovation of Pantharaygaon RWSSEUShompangkha—Cross CuttingOngoing——
Protection of Ghodhi Drang Farm Road through installation of hume pipes and RCC slab and supporting wallsEUSamkhar—Cross CuttingOngoing——
Installation of rainwater harvesting systems and installation of syntax at Zeri, Goethnamthoen, Tshonglinggoenpa and HrangotsheEUMerag—Cross CuttingOngoing——
Construction of Retaining Wall at Pasaphu Road SectionEUKangpar—Cross CuttingOngoing——
Retaining Wall Construction at Chongkarmo (RCC Wall) at ChangmeEUShongphu—Cross CuttingOngoing——
Installation of HDPE irrigation Channel at Poktor BrangsaEURadhi—Cross CuttingOngoing——
Construction of RCC Culvert at Lower Suskumri Kharphu Farm RoadEULumang—Cross CuttingOngoing——
RWSS for Winter Pasturelands at Thrakthri and JoenkharEUSagteng—Cross CuttingOngoing——
Farm Road Maintenance from Lungdargang to MonglingEUBartsham—Cross CuttingOngoing——
Construction of Irrigation Pipelines from Yemkhar to Dodom VillageEUBidungg—Cross CuttingOngoing——
Construction of box culverts along Shingchen Goenpa Farm RoadEUKanglung—Cross CuttingOngoing——
Construction of Causeway along Chema Farm Road (Pangthang-Ritsangdung Chiwog)EU——Cross CuttingOngoing——
Construction of Causeway with wall at Jomri (Rongthung Chiwog)EU——Cross CuttingOngoing——
Construction of U-drain at Gewog Staff quarterEUUdzorong—Cross CuttingOngoing——
Construction of Wall at Khola CampEUKhaling—Cross CuttingOngoing——
Water source Protection for Darjiling/Ngambinang/DhaliphangmaEUYangnyer—Cross CuttingOngoing——
Construction of Boulder wall and Retaining wall at MangshukpoEUPhongmed—Cross CuttingOngoing——
Construction of River Protection wall at PhakpariEUThrimshing—Cross CuttingOngoing——
Land leveling, teracing and drainage improvement in Shashing and DalimangEUYangtse—Cross CuttingOngoing——
Construction of intake, tanks, and pipelines at Domtsang KarmazomEUKhamdang—Cross CuttingOngoing——
Construction of irrigation drains at WangringmoEURamjar—Cross CuttingOngoing——
Construction of retaining Wall on PHC RoadEUTongmajangsa—Cross CuttingOngoing——
Construction of causeways at Pangringku Farm RoadEU——Cross CuttingOngoing——
Land Development at Draktsa VillageEUToedtsho—Cross CuttingOngoing——
Construction of gabion retaining wall at LangthangbuungEULangthil—Cross CuttingOngoing——
Construction of Footpath, Retaining Wall and Drainage System in Korphu Toed and Maed ChiwogEUKorphu—Cross CuttingOngoing——
Construction of Main FCR Tank and Distribution of Longchu Drinking Water Supply for Samcholing Khatoe and Samcholing Khamay ChiwogsEUDraagteng—Cross CuttingOngoing——
Repair and Maintenance of Chiwog meeting hall and retaining wall at Dorji GoenpaEUNubi—Cross CuttingOngoing——
Construction of Teketing IrrigationEUTangsibji—Cross CuttingOngoing——
Maintenance and Improvement of Irrigation channel at TrashicholingEUPungtenchhu—Cross CuttingOngoing——
Renovation of Galan Irrigation Channel at Bulan irrigation, Tamang Basti, TsirangEUSemjong—Cross CuttingOngoing——
Construction of Permanent Structures along the Gewog Center to Norjangsa Farm RoadEUDunglagang—Cross CuttingOngoing——
Maintenance of Irrigation channel at Wangphu chiwogEUTsirang ToedTsirangCross CuttingOngoing——
Road protection and landslide mitigation at Paray Kholshi, Gomsum Chiwog, Tsholingkhar Gewog, Tsirang.EUTsholingkhar—Cross CuttingOngoing——
Construction of Gabion Wall at Baardara to Gosarling Primary School Farm RoadEUGosarling—Cross CuttingOngoing——
Construction of Retaining Wall at Sergithang - Teendovaney Farm RoadEUSergithang—Cross CuttingOngoing——
Maintainence of Drinking Water Supply at Dharchargang villageEURangthangling—Cross CuttingOngoing——
Improvement of Barshong Maed and Chunniykhang Farm RoadEUBarshong—Cross CuttingOngoing——
Maintenance of Irrigation Channel through HDPE Pipe Installation from Chugasa to GoeshikhaEUGase Tshowogm—Cross CuttingOngoing——
Construction retaining wall and slope stabilization through spring box system at the meeting hall, Chegip GoendepEUKazhi—Cross CuttingOngoing——
Maintenance of Pasakha - Drabchay irrigation channel.EUGase Tshogongm—Cross CuttingOngoing——
Installation of HDPE pipe at Bjaphu Gonpa(Continuation of previous project)EURuebisa—Cross CuttingOngoing——
Construction of Bridge at TakshaEUDarkar—Cross CuttingOngoing——
Laying of Stone soling at Nimdrosa and Tangkhagarey farm roadEUPhobji—Cross CuttingOngoing——
Maintenance of Zawa Irrigation channelEUAthang—Cross CuttingOngoing——
Maintenance of Baychu Irrigation Channel from Zewagang to Poktokarpo at Wangjokha & ThangooEUThedtsho—Cross CuttingOngoing——
Construction of Waste disposal pit at LamsaigangEUDangchhu—Cross CuttingOngoing——
Construction of causeway and drain at Mewangang ChiwogEUGoshing—Cross CuttingOngoing——
Construction of two Retaining wall at Shingkhar-Radhi Farm roadEUShingkhar—Cross CuttingOngoing——
Construction of Retaining Wall at Gojong, Pongchula ChiwogEUPhangkhar—Cross CuttingOngoing——
Dorjilung Hydro Power ProjectWBGDGPC; MoENRLhuentse, MongarEnergyUnknownUSD 515.0mNA – NA
Accelerate Bhutan’s Job Transformation through Renewable Natural Resource Value ChainsWBMoAL; MoENR; BFDA—Agriculture/ ForestryUnknownUSD 34.5m30 Sept, 2030
Bhutan Climate and Disaster Resilience Development Policy Financing with a Catastrophe Deferred Drawdown OptionWBMoF—Cross-cutting – Climate Change, Disaster Risk ManagementUnknownUSD 40.0m—
Strengthening Risk Information for Disaster Resilience in BhutanWBMoHA; MoIT; MoH—Cross-cutting – Climate Change, Disaster Risk ManagementUnknownUSD 5.0m—
Bhutan Green Transport Project (BGTP)WB, Korea- WB Partnership Facility (KWPF), GCFThimphu Thromde; MoFThimphuTransportUnknownUSD 29.5m—
Sustainable Hydropower Development ProjectWBDGPC—EnergyUnknownUSD 4.3m—
UNLICENSED PLATFORM — no valid license for this deployment. Contact the vendor.